In SAP PP as at ECC6.0 EhP6, which of the following Entry Key is used to control the following:
. Material entry is a must
. For + and - quantity can be entered
. Inventory management material
. Variable size material
(only one answer)
A) Item Status.
B) BOM Status.
C) Item Category.
D) Data entry profile.
E) Plant Parameter.
.
Answer: C
ReplyDeleteIMG - Production - Basic Data - Bill of Material - Item Data - Define Item Category (OS13)