Question no 3328 : PP Control Key

In SAP PP as at ECC6.0 EhP6, which of the following parameters are configured in the PP Control Key ?

(more than one answers)

A)   Auto Goods Receipt.
B)   Scheduling.
C)   Milestone Confirmation.
D)   Trigger Point.
E)   Confirmation Requirement.
.

1 comment:

  1. Answer: A, B, C, E

    Refer to OP00 or IMG - Production - Basic Data - Work Center - Routing Data - Define Control Key