This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Tuesday, June 10, 2014

Question no 2392 : Production Resource Tool for Plant Maintenance

In SAP Plant Maintenance ECC6.0 EhP5, which of the following are valid PRTs (Production Resource Tools) which can be assigned to the General Task List Operations ?

(more then one answers)

A)    Document PRT.
B)    Material PRT.
C)    Equipment PRT.
D)    Miscellaneous PRT.
E)    Measuring Point PRT.
.

1 comment:

  1. Measuring Point PRT was added at ECC6.0 EhP3-4. This is to allow the scenario of Counter entry of Measuring Points at IW42 Overall Confirmation.

    ReplyDelete

Note: Only a member of this blog may post a comment.