Question no 2357 : Cost Element for Overhead Cost

In SAP PM ECC6.0, the Cost Element seen in the Cost Element View in the Maintenance Order is derived from which Data Element below ?

(Select one best answer)

A)    Valuation Variant in the Costing Sheet.
B)    Valuation Variant in the Costing Variant.
C)    Basis Row in the Costing Sheet.
D)    Credit Row in the Costing Sheet.
E)    Overhead Rate Row in the Costing Sheet.
.

4 comments:

  1. A, B) The Valuation Variant assigned to the Costing Sheet will indicate the Costing Sheet.

    ReplyDelete
  2. C) The Basis Row in the Costing Sheet will show the Costing Element to used as a basis for the Overhead Rate application.

    ReplyDelete
  3. E) The Overhead Row in the Costing Sheet is to configure for (1) Actual Cost and (2) Plan Cost Overhead Rates to be applied to the Basis Row in the Costing Sheet.

    ReplyDelete
  4. D) There is a cost element assigned at the 'Credit Row' in the Costing Sheet together with a valid period.