In SAP ECC6.0 SD, the determination of the Material Availability Date is via which of the following ?
(only one answer)
A) The Earliest of the Pick/Pack Time.
B) The Latest of the Pick/Pack Time.
C) The Start of the Transportation Lead Time.
D) The Earliest of the Loading Time.
E) Load Time plus Transit Time.
.
(only one answer)
A) The Earliest of the Pick/Pack Time.
B) The Latest of the Pick/Pack Time.
C) The Start of the Transportation Lead Time.
D) The Earliest of the Loading Time.
E) Load Time plus Transit Time.
.
Answer: A
ReplyDeleteBefore the Pick/Pack Time (Earliest of that) is the Material AV date.