Question no 1703 : Kanban Process with Schedule Lines

In SAP PP Kanban ECC6.0, Kanban replenish can work with delivery schedules for a scheduling agreement, do select the correct characteristics ?

(more then one answers)

A)   When the kanban status is set to EMPTY, the system automatically creates a schedule line which is transferred to the vendor.
B)   The delivery address is taken from the control cycle.
C)   At the GR, there is always a 1:1 relationship between the Kanban and the scheduling agreement schedule line.
D)   Kanban indicator must be set in at the Purchasing view of the Material Master.
E)   It is possible to print a kanban in the central GR with or instead of a goods receipt/issue slip.
.

3 comments:

  1. B) The delivery address is taken from the scheduling agreement item (not from control cycle).

    ReplyDelete
  2. C) At the GR, there is no 1:1 relationship between the kanban and the scheduling agreement schedule line. Example, when GR with a large quantity, it is divided into multiple Kanbans.

    ReplyDelete
  3. D) For the scheduling agreement item, with which the KANBAN process is to be carried out, the kanban indicator must be set in the additional data for the
    scheduling agreement item.

    ReplyDelete