In SAP PPPI ECC6.0, the Joint Production Costing in PPPI has the following characteristics ?
(more then one answers)
A) It requires an Appointment Structure.
B) Only when you have Co-Products.
C) It requires a Production Version.
D) Batch management is a requirement.
E) The Material type must allow for the Joint Production Costing.
.
(more then one answers)
A) It requires an Appointment Structure.
B) Only when you have Co-Products.
C) It requires a Production Version.
D) Batch management is a requirement.
E) The Material type must allow for the Joint Production Costing.
.
Answer: A, B, C
ReplyDeleteBatch Management and Material Type do not influence Joint Production Costing.