In SAP PP Kanban ECC6.0, the ___________ defines where the supplier has to deliver the material (for example, gate 1). It is printed on the KANBAN card or is included in the summarized JIT call when it is called.
(only one answer)
A) Delivery Address.
B) Storage Location.
C) Shipping Point.
D) Unloading Point.
E) Goods Receipt Area.
.
(only one answer)
A) Delivery Address.
B) Storage Location.
C) Shipping Point.
D) Unloading Point.
E) Goods Receipt Area.
.
Answer: D
ReplyDeleteOften in the case of external procurement, the vendor may not be required to deliver the
ReplyDeletematerial directly to the supply area in the production but to a certain "unloading point".
From this location, the kanban batch of material are transported to the supply area. Therefore, the unloading point
defines where the supplier has to deliver the material (for example, door 1). The information is to be printed on the KANBAN card or it can be included in the summarized JIT call when it is
called. In this case, the goods receipt is posted directly to the receiving storage
location).