PLM300 Plant Maintenance
Unit 03 Technical Objects
The Construction type field in the Equipment master stores the _____________ .
(only one answer)
(A) Maintenance Plan for the Equipment.
(B) Construction Category
(C) Functional Location.
(D) Work Center.
(E) Material Master of a BOM Header.
.
Answer: E
ReplyDeleteConstruction type field is for the Header of a Material BOM.
ReplyDelete