Question no 1781 : Inspection Recording

In SAP QM ECC6.0, which of the following statement is TRUE about Inspection Recording for an inspection lot ?

(only one answers)

A)     Results Recording is always mandatory for an inspection lot.
B)     Defect Recording is always mandatory for an inspection lot.
C)     Both Results Recording and Defects Recording depending on the Inspection Type.
D)     Due to integration to the Logistics Supply Chain, an inspection lot is always automatically generated and not possible to be manually created.
E)     An inspection lot is created only for one material or several materials in each inspection lot.
.

1 comment:

  1. Results Recording and Defects Recording are not necessary. This is true for QM process as not all scenario want to record RR in SAP but only to record the UD.