This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Friday, January 11, 2013

Question no 1788 : Dynamic Modification Assignment

In SAP QM ECC6.0, the Dynamic Modification Rule can be assigned to which object in the SAP QM module ?

(more then one answers)

A)    Material Master QM view's Inspection type assignment folder.
B)    Master Inspection Characteristics.
C)    Inspection Plan Header
D)    Inspection Plan operation detail where the Master Inspection Characteristics are assigned.
E)    Inspection Method.
.

3 comments:

  1. It is assigned to the Inspection Plan Header and Material Master QM view inspection type folder.

    ReplyDelete
  2. You can also assign the Dynamic Modification Rule directly to the Master Inspection Characteristic when it is entered into an operation in the Inspection Plan. However, there are no DMR assigned to the Operation of the Inspection Plan itself.

    ReplyDelete

Note: Only a member of this blog may post a comment.