In SAP QM ECC6.0, which of the following can be assigned to the Inspection type in the QM view of the Material Master ?
(more then one answers)
A) Sampling Procedure.
B) Inspection Method.
C) Inspection Plan.
D) Dynamic Modification Rule.
E) QM order number.
.
(more then one answers)
A) Sampling Procedure.
B) Inspection Method.
C) Inspection Plan.
D) Dynamic Modification Rule.
E) QM order number.
.
Inspection Methods are assigned to the Master Inspection Characteristics and not in the Material Master inspection type. While Inspection Plan is automatically determined when the inspection lot is created.
ReplyDelete