In SAP Plant Maintenance as at ECC 6.0, you can assign Material BOM to the following except ?
(more than one answers)
A) as a Construction type in the Equipment Master.
B) as an Assembly in the Maintenance Plan Header.
C) as an Assembly in the Maintenance Task List Header.
D) as a Construction type in the Functional Location Master.
E) as an Assembly in the Maintenance Plan Strategy.
.
(more than one answers)
A) as a Construction type in the Equipment Master.
B) as an Assembly in the Maintenance Plan Header.
C) as an Assembly in the Maintenance Task List Header.
D) as a Construction type in the Functional Location Master.
E) as an Assembly in the Maintenance Plan Strategy.
.
Answer: B, E
ReplyDeleteECC6.0 not yet possible in MP Header nor MP Startagy.
ReplyDelete