This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Tuesday, November 7, 2017

Question no 3462 : Material BOM Assignment in PM

In SAP PM as at ECC6.0 EhP7, the Material BOM can be Assigned to which of the following ?

(more than one answers)

A)   Maintenance Plan Header.
B)   Maintenance Plan Item.
C)   Task List Header.
D)   Equipment.
E)   Functional Location.
.

Answer: C, D, E

C) as Assembly (IA05,06)
D) as Construction Type in Structure tab in IE01, IE02
E) as Construction Type in Structure tab in IL01, IL02

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.