In SAP PM as at ECC6.0 EhP7, the Material BOM can be Assigned to which of the following ?
(more than one answers)
A) Maintenance Plan Header.
B) Maintenance Plan Item.
C) Task List Header.
D) Equipment.
E) Functional Location.
.
Answer: C, D, E
C) as Assembly (IA05,06)
D) as Construction Type in Structure tab in IE01, IE02
E) as Construction Type in Structure tab in IL01, IL02
(more than one answers)
A) Maintenance Plan Header.
B) Maintenance Plan Item.
C) Task List Header.
D) Equipment.
E) Functional Location.
.
Answer: C, D, E
C) as Assembly (IA05,06)
D) as Construction Type in Structure tab in IE01, IE02
E) as Construction Type in Structure tab in IL01, IL02
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.