This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Wednesday, September 29, 2021

Question no 3882 : Material BOm and Equipment BOM

In SAP PM as at ECC6.0 EhP8, which of the following about Equipment BOM are TRUE ?

(more than one answers)

A)  There is no Group number for Material BOM.
B)  The BOM Usage is "4".
C)  An EQ BOM can be assigned to a Maintenance Item.
D)  When a Maintenance Order ia created for an Equipment, then the Equipment BOM components can be selected and transfer to the Maintenance Order Components requirements.
E)  A Construction Type can be assigned to an Equipment even if the Equipment is created with an EQ BOM. In this case both the Components from the Construction Type's Material BOM and the Components in the Equipment BOM are selectable in the Maintenance Order.
.

Answers: B, D, E

A) Material BOM has system generated Group number, you can find the Group number in the Maetrial BOM Header.
B) BOM Usage "4" is delivered by SAP for EQ, FL, and Material BOM as a validation for the BOM to be used for Plant Maintenance processes.
C) You can assign a Task List to the Maintenance Item but not a BOM directly to the Maintenance Item.
D) An EQ BOMs components are available for selection in the MO.
E) Both Material BOM component via Construction Type and the EQ BOM components can be selected in an MO, there are no conflict and both components from Material and EQ BOM can be selected in the Maintenance Order.



No comments:

Post a Comment

Note: Only a member of this blog may post a comment.