In SAP PM as at ECC6.0 EhP6, how can the Call Horizon be entered in the Maintenance Plan Header ?
(more than one answers)
A) % and days withing the same Maintenance Plan.
B) days only in a Maintenance Plan.
C) % only in a Maintenance Plan.
D) All of the above.
E) None of the above.
.
Answer: B, C
In one of the enhancement package in ECC6, Call Horizon can either be in % or days in an MP but not both.
(more than one answers)
A) % and days withing the same Maintenance Plan.
B) days only in a Maintenance Plan.
C) % only in a Maintenance Plan.
D) All of the above.
E) None of the above.
.
Answer: B, C
In one of the enhancement package in ECC6, Call Horizon can either be in % or days in an MP but not both.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.