In SAP PM as at ECC6.0 EhP6, which of the following are Call Objects possible in PM Maintenance Plan ?
(more than one answers)
A) Maintenance Notification.
B) Maintenance Order.
C) Service Entry Sheet.
D) Confirmation Slip.
E) Inspection Lot.
.
Answers: A, B, C
E) Inspection Lot as a Call Object is for QM Stability Study scenario.
(more than one answers)
A) Maintenance Notification.
B) Maintenance Order.
C) Service Entry Sheet.
D) Confirmation Slip.
E) Inspection Lot.
.
Answers: A, B, C
E) Inspection Lot as a Call Object is for QM Stability Study scenario.
In Plant Maintenance Preventive Scenario, the call object can be the following
Call object - Maintenance NotificationCall object -Maintenance OrderCall object -Service Entry SheetCall object -Maintenance Order (from MO generated Inspection Lot) for Calibration
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.