This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Thursday, November 2, 2017

Question no 3460 : PM Master data link possibilities

In SAP PM as at ECC6.0 EhP6, which of the following are possible link assignments in PM Master Data ? 

(more than one answers)

A)  Equipment already created can be linked to Material-Serial.
B)  Equipment already created can be linked to Material without Serial.
C)  Material-Serial already created can be linked to an Equipment.
D)  A Material can be received into Serial and Equipment.
E)  A Material can be received as Serial without Equipment.

Answer: A, B, C, D, E 

All Possible.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.