In SAP PM as at ECC6.0 EhP6, which of the following are possible link assignments in PM Master Data ?
(more than one answers)
A) Equipment already created can be linked to Material-Serial.
B) Equipment already created can be linked to Material without Serial.
C) Material-Serial already created can be linked to an Equipment.
D) A Material can be received into Serial and Equipment.
E) A Material can be received as Serial without Equipment.
.
Answer: A, B, C, D, E
All Possible.