Question no 3471 : Long Term Planning Scenario Stock settings

In SAP PP as at ECC6.0 EhP6, the Stock settings in a Long Term Planning Scenario provides the following Opening Stock scenario EXCEPT one ?

(only one answer)

A)  No opening stock.
B)  Opening stock as safety stock.
C)  Plant stock at the time of planning.
D)  Average Plant stock from the material master.
E)  Exclude QI and Bock stock.
.

Answer: E

Review MS31 under control parameters segment, opening stock field selection possibilities.