In SAP PP as at ECC6.0 EhP6, which of the following 2 settings are available for the Gross Requirement Planning control indicators in a PP Long Term Planning Scenario ?
(more than one answers)
A) Switch off scarp calculation.
B) Change scrap factor percentage.
C) User gross lot size.
D) Change from Net to Gross Planning.
E) Switch the MRP Strategy from 10 to 11.
.
Answer: A, C
Review parameters possible in MS31
(more than one answers)
A) Switch off scarp calculation.
B) Change scrap factor percentage.
C) User gross lot size.
D) Change from Net to Gross Planning.
E) Switch the MRP Strategy from 10 to 11.
.
Answer: A, C
Review parameters possible in MS31