In SAP PM as at ECC6.0 EhP6, which of the following parameters are available in the Serialization Procedure in the Serial Profile ?
(more than one answers)
A) Serial number usage requirement.
B) Material creation requirement.
C) Equipment creation requirement.
D) Valuation Type requirement.
E) Batch requirement.
.
Answer: A, C
OIS2
(more than one answers)
A) Serial number usage requirement.
B) Material creation requirement.
C) Equipment creation requirement.
D) Valuation Type requirement.
E) Batch requirement.
.
Answer: A, C
OIS2
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.