In SAP PM as at ECC6.0 EhP6, the item category "L" in a Maintenance Order expect the following ?
(more than one answers)
(A) only positive qty entered in the qty field.
(B) either positive or negative qty entered in the qty field.
(C) a material master.
(D) material master is optional but description, uom, and material group is mandatory.
(E) a plant.
.
Answer: B, C, E
The SAP delivery item category "L" expects a material, qty can be -ive or +ive, uom likely from the material master, and plant.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.