In SAP as at ECC6.0 EhP6, Material Master created with the IBAU Material Type can only be assigned to the BOM as an assembly using which of the following Item category ?
(only one answer)
A) "L"
B) "N"
C) "C"
D) "I"
E) "B"
.
Answer: D
"I" PM Structure Element
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.