In SAP PM as at ECC6.0 EhP6, a Maintenance item can have the following contents assignment, select the correct statements.
(more than one answers)
A) A Maintenance Task list assignment is optional.
B) A Reference Object assignment is optional.
C) Scheduling period assignment is optional.
D) Call Horizon is optional.
E) A priority code entry is optional.
.
Answer: A, B, C, D, E
Indeed, all are optional. Try it yourself. as least at the version said above.
(more than one answers)
A) A Maintenance Task list assignment is optional.
B) A Reference Object assignment is optional.
C) Scheduling period assignment is optional.
D) Call Horizon is optional.
E) A priority code entry is optional.
.
Answer: A, B, C, D, E
Indeed, all are optional. Try it yourself. as least at the version said above.