In SAP PM as at ECC6.0 EhP6, the following are valid Call Objects for the Maintenance Plans in Plant Maintenance, select the correct ones ?
(more than one answers)
A) Service Entry Sheet.
B) Maintenance Order.
C) Inspection Lot.
D) Maintenance Notification.
E) Confirmation Slip.
.
(more than one answers)
A) Service Entry Sheet.
B) Maintenance Order.
C) Inspection Lot.
D) Maintenance Notification.
E) Confirmation Slip.
.
Answer: A, B, D
ReplyDeleteC) Inspection lot cannot be called directly via the maintenance plan category for PM. (it is used in QM)
ReplyDelete