In SAP PM as at ECC6.0 EhP7, which of the following methods can generate or create Maintenance Notification ?
(more than one answers)
A) When saving a Maintrnance Order.
B) At the Point of saving a matrial withdrawal via MIGO.
C) Confirmation of hours via Overall Confirmation.
D) Scheduling a Maintenance Plan.
E) Within Structure Hierarchy IH01.
.
(more than one answers)
A) When saving a Maintrnance Order.
B) At the Point of saving a matrial withdrawal via MIGO.
C) Confirmation of hours via Overall Confirmation.
D) Scheduling a Maintenance Plan.
E) Within Structure Hierarchy IH01.
.
So far at the version stated except in MIGO in standard SAP.
ReplyDelete