Question no 3127 : Control staggered delivery requirements via MRP mechanics

In SAP MM or PP as at ECC6.0 EhP6, which of the following field in the Lot Size key configuration allows you to set MRP run to generate staggered delivery for a Requirement using Forward or Backward rules ?



(only one answer) 

A)   Lot size indicator and No. of periods
B)   Scheduling method
C)   Date Interpretation
D)   Overlapping
E)   Splitting quota
.

1 comment:

  1. Refer to http://cwwongsap.blogspot.my/search/label/~%20MRP%20Lot-Size%20with%20Backward%20Overlap