Question no 3106 : Revision Level

In SAP QM as at ECC6.0 EhP6, which of the following QM master data allow creation using Revision Level ?

(More than one answers)

A)   Quality Info Record.
B)   Inspection Plan.
C)   Material Specification.
D)   Inspection Method.
E)   Master Inspection Characteristics.
.

4 comments:

  1. C) Material Specification do not have facility for Change Number or Revision level. However via QS63, changes can be done for a key date.

    ReplyDelete
  2. D) Inspection Method also do not have facility for Change Number or Revision level. However, via QS32, a Version can be create for Inspection Method (similar to Master Inspection Characterstics). Also, via QS33, change using a key date is possible.

    ReplyDelete
  3. E) Master Inspection Characteristics do not have facility for Change Number or Revision Levels. However, via QS22, a Version can be created for the Master Inspection Characteristics. Also via QS23, change using a key date is possible.

    ReplyDelete