Question no 3100 : MEB connecting Notification to Order

In SAP PM as at ECC6.0 EhP6, which of the following connects One Maintenance Notification to Multiple Maintenance Orders in Maintenance Event Builder (MEB) ?

(only one answer)

A)   Collective number.
B)   Priority code.
C)   Maintenance Activity Type.
D)   Similar number range for both Document Types.
E)   Revision.
.

1 comment:

  1. Before the introduction of MEB, Notification to Order link only allow 1:1 or Many:1 scenario. The MEB scenario is introduced to support 1:Many scenario. Since there is only one field to assign only one Maintenance Order in the Notification document; the Revision was introduced to make this 1:Many relationship possible only via MEB as at ECC6 EhP6.