In SAP QM as at ECC6 EhP6, which of the following are mandatory setup in the Calibration Task List for the Calibration scenario for PM-QM integation ?
(only than one answer)
A) Inspection Point in the header of the General Task List.
B) Inspection Point in the Equipment Master.
C) Inpsection Point in the Master Inspection Characteristics.
D) Inspection Point in the Maintenance Plan.
E) Inspection Point in the Operation detail where the Master Inspection Characteristics area assigned at.
.
(only than one answer)
A) Inspection Point in the header of the General Task List.
B) Inspection Point in the Equipment Master.
C) Inpsection Point in the Master Inspection Characteristics.
D) Inspection Point in the Maintenance Plan.
E) Inspection Point in the Operation detail where the Master Inspection Characteristics area assigned at.
.
Answer: A
ReplyDeleteHeader Task List.
ReplyDelete