This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Wednesday, March 16, 2016

Question no 3103 : Engineering Change for QM

In SAP QM as at ECC6.0 EhP6, which of the following QM Master data can use Engineering Change Control to manage changes ?

(more than one answers)

A)    Quality Info Record.
B)    Master Inspection Characteristics.
C)    Inspection Plan.
D)    Material Specification.
E)    Inspection Method.

1 comment:

  1. The following can be subjected to Engineering Change:
    Inspection Plan
    Reference Operation Set
    Master Inspection Characteristics
    Characteristics
    Class
    Material Master

    ReplyDelete

Note: Only a member of this blog may post a comment.