In SAP QM as at ECC6.0 EhP6, which of the following QM Master data can use Engineering Change Control to manage changes ?
(more than one answers)
A) Quality Info Record.
B) Master Inspection Characteristics.
C) Inspection Plan.
D) Material Specification.
E) Inspection Method.
.
(more than one answers)
A) Quality Info Record.
B) Master Inspection Characteristics.
C) Inspection Plan.
D) Material Specification.
E) Inspection Method.
.
The following can be subjected to Engineering Change:
ReplyDeleteInspection Plan
Reference Operation Set
Master Inspection Characteristics
Characteristics
Class
Material Master