In SAP CO-PCP, you can include the scrap factor in which of the following master data ?
(more then one answers)
A) at Material Master MRP4 view, component scrap factor.
B) at BOM item, component scrap factor.
C) at Routing Operation detail, operation scrap factor.
D) at BOM item, operation scrap factor.
E) at Material Master MRP1 view, assembly scrap factor.
.
(more then one answers)
A) at Material Master MRP4 view, component scrap factor.
B) at BOM item, component scrap factor.
C) at Routing Operation detail, operation scrap factor.
D) at BOM item, operation scrap factor.
E) at Material Master MRP1 view, assembly scrap factor.
.
In addition there is this NET indicator in the BOM item that can control the scrap factor usage.
ReplyDelete