In SAP CO-PCP, the method to control costing of a material in a Bills of Material is to use which of the following ?
(only one answer)
A) Item Category.
B) BOM Usage.
C) BOM status.
D) Item status.
E) Costing Relevancy Indicator.
.
(only one answer)
A) Item Category.
B) BOM Usage.
C) BOM status.
D) Item status.
E) Costing Relevancy Indicator.
.
Answer: E
ReplyDeleteIf the relevancy to costing indicator is not set, the BOM item is ignored for costing. For the standard cost estimate, the modified standard cost estimate and the current cost estimate, the field can contain an X or be empty.