This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Saturday, October 29, 2022

Question no 3952 : Material BOM assignment in Plant Maintenance Object

In SAP Plant Maintenance, a Material BOM can be assigned to which of the following ?

(more than one answers)

A) Functional Location.
B) Equipment.
C) Measuring Point.
D) Permit.
E) Task List Header.

Answer: A, B, E

A, B) A Material BOM is assigned as a Construction Type in FL and EQ.
C, D) as at ECC6 EhP8 both MP and Permits do not have any facilitation for Material BOM assignments.
E) In the Task List Header, the Assembly field can also be assigned a Material BOM.




No comments:

Post a Comment

Note: Only a member of this blog may post a comment.