Question no 3948 : Requirement Type in Sales Order line item

In SAP Sales & Distribution ECC6 EhP8, how can be the Requirement Type for a Sales Order line item be determined ?

(more than one answers)

A) Material Master Strategy Group in the MRP 3 view.
B) Strategy Group in the MRP Group parameter.
C) Strategy Group in the Plant parameters.
D) Item Category and MRP Type.
E) Item Category and MRP Group.
.

Answer: A, B, D

1. Requirements type via strategy group in the material master's MRP3 view, the strategy group's main strategy will be used to determine the Requiremen type.
2. MRP view was created without the strategy group, the system will then check if MRP group has been assigned in the MRP 1 data view; it will then look for the strategy group in the MRP group parameter and again the Requirement type in the main strategy will be used if any.
3. Assuming no MRP group is assigned in the MRP view but there is an MRP type in MRP 1 view then the system will use the MRP type plus the Sales order line item Category's Item Category to determine the Requirement type.
4. However, if the material was not even extended with an MRP view then the system proceeds to use only the Sales order line Item Category only to determine the Requirement type.
5. If still not found then the system will complain that Requirement type was not found.