Question no 3951 : AMPL

In SAP Materials Management ECC6.0 EhP8, AMPL is used for which of the following ?

(only one answer - selected the most appropriate)

A) MPN Material.
B) Batch Material.
C) Non-Valuated Material.
D) Split Valuation Materials.
E) Non of the above.
.

Answer: A

AMPL or Approved Manufacturer Parts list is required (like a source list) for MPN or Manufacturer Part Number Materials provided that the MPN Profile assign to the Internal Material is set with AMPL requirement.