In SAP Materials Management ECC6.0 EhP8, AMPL is used for which of the following ?
(only one answer - selected the most appropriate)
A) MPN Material.
B) Batch Material.
C) Non-Valuated Material.
D) Split Valuation Materials.
E) Non of the above.
.
Answer: A
AMPL or Approved Manufacturer Parts list is required (like a source list) for MPN or Manufacturer Part Number Materials provided that the MPN Profile assign to the Internal Material is set with AMPL requirement.
(only one answer - selected the most appropriate)
A) MPN Material.
B) Batch Material.
C) Non-Valuated Material.
D) Split Valuation Materials.
E) Non of the above.
.
Answer: A
AMPL or Approved Manufacturer Parts list is required (like a source list) for MPN or Manufacturer Part Number Materials provided that the MPN Profile assign to the Internal Material is set with AMPL requirement.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.