In SAP PP as at ECC6.0 EhP6, which of the following planning area do not consider MRP Strategies ?
(only one answer)
A) SOP.
B) LTP.
C) MPS.
D) PIR.
E) MRP.
.
Answer: A
SOP (Sales and Operations Planning) never consider Strategies at the version mentioned.