This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Tuesday, May 13, 2014

Question no 2371 : Permits in Plant Maintenance

In SAP PM as at ECC6.0, you can assign Permit Master to which of the following ?

(more then one answers)

A)    Functional Location.
B)    Measuring Point.
C)    Maintenance Work Center.
E)    Equipment Master.
F)    Reference Functional Location.
.

3 comments:

  1. Permit Masters are always allowed for only Functional Location and Equipment Masters. In both the FL and EQ master use menu Goto - Permits.

    ReplyDelete
  2. As at ECC6.0 EhP5, it is not yet possible to assign Permit Master to Reference Functional Locations.

    ReplyDelete

Note: Only a member of this blog may post a comment.