This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Friday, September 13, 2013

Question no 2034 : Dynamic Modification

In SAP QM ECC6.0, you can enter the Dynamic Modification Rule in which of the following Data Objects ?

(more then one answers)

A)     at the Plant level of the material master QM data view.
B)     at the Inspection type detail within the material master QM data view.
C)     at the Inspection task list header.
D)     at the Material Specification.
E)     at the Inspection Method.
.

2 comments:

  1. The Dynamic Modification Rule are assigned as the following:
    . Material master Inspection Type Detail
    . Inspection Task List Header
    . to the Sampling Procedure (set relationship)

    ReplyDelete

Note: Only a member of this blog may post a comment.