In SAP QM ECC6.0, if you want to record the appraisal costs for a combination of inspection type and material, you can achieve this via which of the following ?
(only one answer)
A) Assign a settlement rule to the Inspection type for the Material Master.
B) Set the cost collector indicator in the Inspection type.
C) Ensure the Inspection task list is assign with a Costing Variant.
D) Ensure the costing view is created for the material master.
E) Assign a QM order to inspection type detail in the material master QM view.
.
(only one answer)
A) Assign a settlement rule to the Inspection type for the Material Master.
B) Set the cost collector indicator in the Inspection type.
C) Ensure the Inspection task list is assign with a Costing Variant.
D) Ensure the costing view is created for the material master.
E) Assign a QM order to inspection type detail in the material master QM view.
.
Answer: E
ReplyDeleteYou can either collect all cost in a QM order (assign in the Inspection type detail in the QM view of the material master) or each inspection lot with an individual QM order.
ReplyDelete