In SAP ECC6.0 MM, which of the following are possible selection criteria for processing quotation price comparison ?
(more than one answers)
(A) Requirement tracking number
(B) RFQ number
(C) Vendor
(D) Collective RFQ number
(E) Material number
.
(more than one answers)
(A) Requirement tracking number
(B) RFQ number
(C) Vendor
(D) Collective RFQ number
(E) Material number
.
Answer: B, C, D, E
ReplyDeleteAt least as at ECC6.0, the Requirement Tracking Number is not available in the RFQ.
ReplyDelete