In SAP ECC6.0 MM, which of the following statements are true about Material Master ?
(more than one answers)
(A) Material master has views that reflect individual department data requirements
(B) Material master record views are at client, purchasing organization and plant levels.
(C) Each material is assigned to a material type when it is first created, changes to another material type is not allowed once inventory are posted.
(D) Each material is assigned to a material type when it is first created, changes to another material type is always possible as the flexibility ensures data consistencies.
(E) A material master can be created with only the Basic view.
.
(more than one answers)
(A) Material master has views that reflect individual department data requirements
(B) Material master record views are at client, purchasing organization and plant levels.
(C) Each material is assigned to a material type when it is first created, changes to another material type is not allowed once inventory are posted.
(D) Each material is assigned to a material type when it is first created, changes to another material type is always possible as the flexibility ensures data consistencies.
(E) A material master can be created with only the Basic view.
.
Answer: A, C, E
ReplyDeleteThe Purchasing View of the Material Master is only at the Plant level, the Purchasing Organization is never an Organizational Structure element for creating the Material Master.
ReplyDeleteYou can use the T-code "MMAM" to change material type, provided no active elements were created for the Material such as PR, PO, Reservations, or Stocks.
ReplyDelete