This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Monday, June 18, 2012

Question no 1592 : Approved Manufacturer Part List

In SAP MM, the Approved Manufacturer Part List (AMPL) is only valid when ______________ .

(only one answer)

A) The Configuration for AMPL is set to be mandatory at Plant level.
B) When the Source List is disabled in the Customizing.
C) When the Material Master is set with AMPL requirement indicator.
D) When the Manufacturer Part Profile with AMPL requirement is assigned to the Material Master.
E) If the Schema for Source Determination includes the AMPL.
.

3 comments:

  1. You can find transaction code MP01 is to perform the entry of AMPL for the Internal Material which has been assigned a Manufacturer Part Profile. Warning is issued if AMPL is not found in the Manufacturer Part Profile while no messages if AMPL is found in the Manufacturer Part Profile. The List of MPN Material are entered in the transaction detail.

    ReplyDelete
  2. AMPL is thus like a source list but only design for Manufacturer Part Numbers.

    ReplyDelete

Note: Only a member of this blog may post a comment.