Question no : 635 PM Order Refurbishment Concept

PLM300 Plant Maintenance
Unit 06 Refurbishment of Spare Parts

What are the steps in the refurbishment process ?
(more than one answers)

(A) Create a special refurbishment order with a “from” and “to” status of the valuation types.
(B) Withdraw the defective material from the warehouse with a goods issue.
(C) Return the repaired material by reversing the goods issue.
(D) Define a settlement profile with material as the default account assignment.
(E) Create a internal stock transfer order to transfer the stocks from the PM system to the MM system.
.