This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Friday, March 15, 2024

Question no 3992 : Measuring Point assignments

In SAP Plant Maintenance at at ECC6 EhP8, a Measuring Point can be assigned to which of the following ?

(more than one answers)

A. Functional Location.
B. Equipment.
C. Task List Header.
D. Task List Operation.
E. Maintenance Plan Header.
.

Answer: A, B, D, E

A, B) One of more Measuring Points can be assigned to a Functional Location or Equipment Master.
C) Task List Header does not facilitate the assignment of MPs.
D) There are 5 objects assignable to a Task List Operation as a PRT, and one of the PRT type is a Measuring Point.
E) For Performance based Maintenance Plan of either Single Cycle or Strategy Plan, the relevant Measuring Point is assigned at the Maintenance Plan Header.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.