In SAP ECC6 EhP8, which of the following is used to activate Cost Collect or Period based Costing for Production Order ?
(only one answer)
A) Plant Parameters.
B) Production Scheduler.
C) Production Scheduler Profile.
D) Order Type Plant dependent Parameter.
E) Material Master Work Scheduling view.
.
Answer: D
(only one answer)
A) Plant Parameters.
B) Production Scheduler.
C) Production Scheduler Profile.
D) Order Type Plant dependent Parameter.
E) Material Master Work Scheduling view.
.
Answer: D