In SAP QM as at ECC6.0 EhP6, which of the following scenario is the "Inspection Interval" in the QM data view for ?
(only one answer)
A) Interval between recurring inspection for the same batch.
B) Total inspection time for an Inspection Lot.
C) The minimum interval must past before the next inspection for an inspection lot can be generated.
D) Interval between inspections for In-Process Quality Control for Production.
E) Copied to the Maintenance Plan Header as the Cycle for Refurbishment scenario.
.
click "1 comment" to view possible solution
(only one answer)
A) Interval between recurring inspection for the same batch.
B) Total inspection time for an Inspection Lot.
C) The minimum interval must past before the next inspection for an inspection lot can be generated.
D) Interval between inspections for In-Process Quality Control for Production.
E) Copied to the Maintenance Plan Header as the Cycle for Refurbishment scenario.
.
click "1 comment" to view possible solution
Answer: A
ReplyDeleteFor Inspection Type 09 "Recurring Inspection"