This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Wednesday, November 11, 2020

Question no 3760 : Sampling Manual Entry

In SAP QM as at ECC6.0 EhP6, which of the following is the effects of setting "Manual Entry" for Sample Size in the Inspection Type detail in the Material Master ?

(only one answer)

A)  Sample Size is expected to be entered at MIGO screen.
B)  Sample Size is expected to be entered in the Purchase Order item detail.
C)  Sample Size is expected to be entered during Results Recording.
D)  Sample Size is expected to be entered in the Inspection Lot before it can be Released.
E)  Sample Size is expected to be entered in the Quality Info Record.
.

click "1 comment' to view suggested solution

1 comment:

  1. Answer: D

    Inspection Lot will still be created at MIGO, but it is with "CRTD" status without Sample Size calculation. User will have to access the Inspection Lot to enter the Sample Size manually before it can be Released for Results Recording.

    ReplyDelete

Note: Only a member of this blog may post a comment.