This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Wednesday, October 9, 2019

Question no 3664 : Maintenance Notification

In SAP PM as at ECC6.0 EhP6, which of the following is not true about a Maintenance Notification ?

(more than one answers)

A)  It can be assigned to a PM Order to collect costs.
B)  It can be generated via Saving a Maintenance Order.
C)  It can be assigned with one or more General Task List.
D)  It can be created without a reference Object.
E)  It can be closed without converting to a Maintenance Order.
.

Click on "1 comment:" for suggested answer

1 comment:

  1. Answers: A, C
    A) no cost collection yet possible for the Notification in PM as at the version mentioned.
    B) via an appropriate MO Order Type, a Notification can be generated from an MO.
    C) Only one Task List per Notification.
    D) Unless field selection was activated.
    E) A Notification can stand alone without linking to an MO.

    ReplyDelete

Note: Only a member of this blog may post a comment.