In SAP QM as at ECC6.0 EhP6, to achieve sample size for different lot size ranges, which of the following is necessary ?
(only one answer)
A) Sampling Scheme.
B) Dynamic Modification.
C) Inspection Type activated in the IMG.
D) Inspection Lot Document Type activated in the IMG.
E) Material Specification.
.
Answer: A
(only one answer)
A) Sampling Scheme.
B) Dynamic Modification.
C) Inspection Type activated in the IMG.
D) Inspection Lot Document Type activated in the IMG.
E) Material Specification.
.
Answer: A
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.